Projects

  • MOTORWAY CONNECTION CONNECTING THE PORT OF ORAN TO THE EASTWEST HIGHWAY OVER 26 KM
  • TECHNICAL AND GEOTECHNICAL STUDY OF REALIZATION OF TRACK PK 200 ON 180 KM
  • STUDY FOR THE EXTENSION OF AIRCRAFT INFRASTRUCTURE OF THE AIRPORT "Messali el Hadj"
  • Approval of the implementation studies, monitoring and control of the works of realization of the railway line of 51 km (boughezoul - m'sila)
  • GUERRARA
    Geometric follow-up of the work of completion of the northern avoidance of the agglomeration of Guerrara on 7.2 km »
  • CW46
    The Control and Technical Follow-up of the works of the "Realization of a work of art on railway of the ramp connecting the 2 nd ring road / CW46"
  • a
    Technical assistance and follow-up of protective works with duplication of CW111 between CHERAGA AND PLATEAU AIN BENIAN
  • iki
    Completion of the opening work of the tiririne terminal 10 on 120 km
Comments for this post are closed.