24/10/2014 23/03/2018 By Support 0 Comments Projects MOTORWAY CONNECTION CONNECTING THE PORT OF ORAN TO THE EASTWEST HIGHWAY OVER 26 KM TECHNICAL AND GEOTECHNICAL STUDY OF REALIZATION OF TRACK PK 200 ON 180 KM STUDY FOR THE EXTENSION OF AIRCRAFT INFRASTRUCTURE OF THE AIRPORT "Messali el Hadj" Approval of the implementation studies, monitoring and control of the works of realization of the railway line of 51 km (boughezoul - m'sila) Geometric follow-up of the work of completion of the northern avoidance of the agglomeration of Guerrara on 7.2 km » The Control and Technical Follow-up of the works of the "Realization of a work of art on railway of the ramp connecting the 2 nd ring road / CW46" Technical assistance and follow-up of protective works with duplication of CW111 between CHERAGA AND PLATEAU AIN BENIAN Completion of the opening work of the tiririne terminal 10 on 120 km Comments for this post are closed.
MOTORWAY CONNECTION CONNECTING THE PORT OF ORAN TO THE EASTWEST HIGHWAY OVER 26 KM TECHNICAL AND GEOTECHNICAL STUDY OF REALIZATION OF TRACK PK 200 ON 180 KM STUDY FOR THE EXTENSION OF AIRCRAFT INFRASTRUCTURE OF THE AIRPORT "Messali el Hadj" Approval of the implementation studies, monitoring and control of the works of realization of the railway line of 51 km (boughezoul - m'sila) Geometric follow-up of the work of completion of the northern avoidance of the agglomeration of Guerrara on 7.2 km » The Control and Technical Follow-up of the works of the "Realization of a work of art on railway of the ramp connecting the 2 nd ring road / CW46" Technical assistance and follow-up of protective works with duplication of CW111 between CHERAGA AND PLATEAU AIN BENIAN Completion of the opening work of the tiririne terminal 10 on 120 km