Approval of the implementation studies, monitoring and control of the works of realization of the railway line of 51 km (boughezoul – m’sila)
The national agency for the study and monitoring of the implementation of railway investments (ANESRIF) in the framework of the reinforcement of its railway infrastructure, has entrusted the Oran technical study company with the execution of the project mentioned above. .
PROJECT DURATION :
- 37 MONTHS
OBJECTIVE OF THE PROJECT :
To accomplish the tasks and objectives requested by the customer, the SETO was inspired both by the content of the technical prescriptions and by the experiences gained during the realization of similar services on the various projects on behalf of different project managers.
The model of organization and performance of services is developed in several phases.
DIFFERENT PHASES OF THE PROJECT:
Phase 0: Site Installation and APD Review
Phase 1: control and approval of execution studies
Phase 2: start of major earthworks of tunnels and roads and start of works of art works, station buildings, start of preparatory work-production.
Phase 3: track work, signaling, telecommunication
Phase 4: the phase of provisional acceptance, complement, verification and approval of plans, documentation of works and approval of equipment.
The national agency for the study and monitoring of the implementation of railway investments (ANESRIF) in the framework of the reinforcement of its railway infrastructure, has entrusted the Oran technical study company with the execution of the project mentioned above. .
PROJECT DURATION :
- 37 MONTHS
OBJECTIVE OF THE PROJECT :
To accomplish the tasks and objectives requested by the customer, the SETO was inspired both by the content of the technical prescriptions and by the experiences gained during the realization of similar services on the various projects on behalf of different project managers.
The model of organization and performance of services is developed in several phases.
DIFFERENT PHASES OF THE PROJECT:
Phase 0: Site Installation and APD Review
Phase 1: control and approval of execution studies
Phase 2: start of major earthworks of tunnels and roads and start of works of art works, station buildings, start of preparatory work-production.
Phase 3: track work, signaling, telecommunication
Phase 4: the phase of provisional acceptance, complement, verification and approval of plans, documentation of works and approval of equipment.