- Presentation:
The Department of Structures of Art, realized the study relative to the various specialties "Works of Art," the follow-up of the realization and the accompaniment of the project owner from the conception of the project until its reception and its commissioning.
Our department has several missions:
- Studies of Structures;
- Sanitation studies;
- Control and Monitoring;
- Expertise and Rehabilitation.
- List of projects carried out as part of studies and monitoring of structures:
- Our office has produced several structures as part of the studies:
- Study of a viaduct on Oued Bechar over 40m in length (W .BECHAR);
- Study of a Viaduct on Wadi Zousfana over 80 m in length (W. BECHAR);
- Study of a Viaduct on Wadi NAMOUS over 30 m length (W. BECHAR);
- Study of a Viaduct over Oued Djorf Torba over a length of 20 m (W. BECHAR);
- Study of a Viaduct on Oued Guir over 20 m in length (W. BECHAR);
- Study of a viaduct over Oued Ayoun Branisse over 20 m in length (W .SAIDA);
- Study of a viaduct on oued MINA over 20 m length (W.MOSTAGANEM);
- Studies of the works of art of the Highway East West on 150 Km;
- Studies of the Structures of the Mostaganem Motorway Ramp (31 works);
- Studies of the structures of the highways motorway ring road (21 Works),
- Studies of Structures on the Tlemcen-El Aricha Motorway Ramp (57 works)
- Studies of the Structures of the Chéf Autoroute (68 Books);
- Studies of the Structures of the Motorway Stretches of Sidi Bel Abbes (29 Works)
- Studies of non-current structures on the splitting of RN06 over 273 km (30 works) (W NAAMA);
- Studies of non-routine works on the duplication of RN06 over 48km (10 Works) (W. EL BAYADH);
- Study Of A Work Of Art Destined For The Passage Of The Career Gear Of The Zahana Cement Factory (CEMENT COMPANY OF ZAHANA "S. C. 1. Z");
- Study of a Support Device at Oued level (SORFERT- -SPA),
- Study of four (04) structures on CW12 (W. BECHAR),
- Study of four (04) structures on RN06B (W. BECHAR);
- Two Hopper Study at RN22C and Maghnia (W. TLEMCEN)
- Study of non-standard works on the Modernization of CW 35 between Oued Tlelat and Oran over 25 km (W.ORAN);
- Study of non-current works on the modernization of the CW75 between Canastel and Kristel over 25kms (W.ORAN);
- Study of the non-current works on the duplication of RN23 between mesra and w.Relizane on 30kms (W.MOSTAGANEM);
- Approval of the execution studies (Structures) of the railway service Hassi Mefsoukh / Mosæganem on 50 Km;
- Approval of the APD studies (Structures) of the new single-track railway line BOUGHEZOUL-M'SILA (151km).
- In addition to these studies, our office has established several follow-up works of art:
- Follow-up Of The Work Of The Making Of An Art Work And Four (O4) Dalots On The Rn06 Between Pk 486-512 (W.BECHAR);
- Follow-up of works of realization of a work of art connecting the RN06 / Boussir on 46kms Ouled Lakhdar Lot N ° 03 (W.BECHAR);
- Follow-up of the Rehabilitation Works of the RN 06 from Pk 997 to Pk 1031 over 34 Km (W.BECHAR);
- Tracking Control and Tracking Track Trace Wilaya 09 At the Edge Of The Dam DJ ORF TOLBA (W.BECHAR);
- Control and follow-up of works of realization of a work of art on Oued Saoura in Ouled Hamza (Ksabi) (W.BECHAR);
- Follow-up of the work of the realization of a work of art in Pk 330 on RN 107 (W.EL BAYADH);
- Follow-up of the work of the realization of a work of art in Pk 317 on RN 107 (W.EL BAYADH);
- Follow-up of the work of the realization of a work of art in Pk 55 on RN 06A (W.EL BAYADH);
- Follow-up of the works of the realization of a work of art in Pk 58 + 200 on RN 06A (W.EL BAYADH);
- Our office has produced several structures as part of the studies:
- List of software used in the study of civil engineering structures:
- CSI SAP2000 (Structural Analysis);
- CSI Bridge (Structural Analysis);
- CSI SAFE (Structural Analysis Foundation);
- Robot, Professional (Structural Analysis);
- EXPERT robot (calculation of reinforcement sections);
- SOCOTEC (calculation of reinforcement sections);
- AutoCAD (for drawing);
- COVADIS (for Sanitation).
- Staff of our department:
- Our department consists of:
- 06 Engineers in civil engineering (vpies, structure and infrastructure);
- 01 Senior Technician in Public Works;
- 01 Technician in Topography.
- Our department consists of:
-
STUDIES OF STRUCTURES -
Sanitation studies -
CONTROL AND MONITORING -
EXPERTISE AND REHABILITATION

