{"id":3243,"date":"2017-09-05T01:46:59","date_gmt":"2017-09-05T00:46:59","guid":{"rendered":"https:\/\/setor.dz\/projets\/etude-technique-et-geotechnique-de-realisation-de-la-piste-pk-200-sur-180-km\/"},"modified":"2018-03-24T22:22:20","modified_gmt":"2018-03-24T21:22:20","slug":"technical-and-geotechnical-study-of-realization-of-track-pk-200-on-180-km","status":"publish","type":"portfolio","link":"https:\/\/setor.dz\/en\/projets\/technical-and-geotechnical-study-of-realization-of-track-pk-200-on-180-km\/","title":{"rendered":"TECHNICAL AND GEOTECHNICAL STUDY OF REALIZATION OF TRACK PK 200 ON 180 KM"},"content":{"rendered":"<p><strong><u>PREAMBLE:<\/u><\/strong><\/p>\n<p>The Directorate of Public Works of the Province of ADRAR has entrusted to S.E.T ORAN, the technical and geotechnical study of the realization of the track pk 200 at point &#8216;(34 \u00b0 37N-0000 \u00b0 56W),<\/p>\n<p>located in the wilaya of ADRAR, under a contract concluded between the DTP \/ S.E.T.O, The present study will include three phases of study: namely<\/p>\n<ul>\n<li>First part: preliminary study.<\/li>\n<li>Second part: pre-project and summary study.<\/li>\n<li>Third part: detailed preliminary design study.<\/li>\n<\/ul>\n<p><strong><u>BASIC PARAMETER OF THE PROJECT:<\/u><\/strong><\/p>\n<p>&#8211; The total length of the route is 180.00 km, the plot curves in plan are between 600 to 2500.<\/p>\n<p>&#8211; The estimated quantities of earthworks are of the order of:<\/p>\n<ul>\n<li>Cutting of 106761 m3<\/li>\n<li>Embankments of 288009m3<\/li>\n<\/ul>\n<p>&#8211; Category C4.<\/p>\n<p>&#8211; Environment E2.<\/p>\n<p>&#8211; Basic speed 80 km \/ h.<\/p>\n<p><strong><u>DESIGNATION OF WORK :<\/u><\/strong><\/p>\n<p><strong><u>Preliminary study ;<\/u><\/strong><\/p>\n<p>Recognition and data collection.<\/p>\n<p>Environmental study.<\/p>\n<p>Draft outline and summary report.<\/p>\n<p>&nbsp;<\/p>\n<p><strong><u>Preliminary study and summary:<\/u><\/strong><\/p>\n<p><u><\/u>Study of the choice of layout (Projection of the variants).<\/p>\n<p>Topographic survey.<\/p>\n<p>APS report study and economic evaluation.<\/p>\n<p>&nbsp;<\/p>\n<p><strong><u>Detailed pre-project study:<\/u><\/strong><\/p>\n<p>APD route (Design study of the road).<\/p>\n<p>ODA development of intersections and intersections.<\/p>\n<p>Detailed study of sanitation works.<\/p>\n<p>Signaling study.<\/p>\n<p>Study of the constraints and parcellaire.<\/p>\n<p>Geotechnical study.<\/p>\n<p>Establishment of the geotechnical investigation program for the route including straps and avoidance.<\/p>\n<p>In situ test (reconnaissance wells up to a depth of 0.3 meters with ethological diagrams of the layers) and sufficient soil replicates for CBR and Proctor.<\/p>\n<p>In situ tests for research of the material deposits.<\/p>\n<p>Tests in the laboratory for research of the gites to materials.<\/p>\n<p>Geotechnical synthesis report and research of the gites to materials.<\/p>\n<p>Development and Editing of CAD.<\/p>\n<p>&nbsp;<\/p>\n<p><strong><u>TIME:<\/u><\/strong><\/p>\n<p>Total project time 8 months:<\/p>\n<ul>\n<li>First part: preliminary study: 1 month.<\/li>\n<li>Second part: preliminary design study: 2 months.<\/li>\n<li>Third part: detailed preliminary design 4 months<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>PREAMBLE: The Directorate of Public Works of the Province of ADRAR has entrusted to S.E.T ORAN, the technical and geotechnical study of the realization of the track pk 200 at point &#8216;(34 \u00b0 37N-0000 \u00b0 56W), located in the wilaya of ADRAR, under a contract concluded between the DTP \/ S.E.T.O, The present study will &hellip;<\/p>\n","protected":false},"author":1,"featured_media":2874,"template":"","meta":{"footnotes":""},"portfolio_category":[53],"portfolio_tag":[],"class_list":["post-3243","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","portfolio_category-projets"],"_links":{"self":[{"href":"https:\/\/setor.dz\/en\/wp-json\/wp\/v2\/portfolio\/3243","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/setor.dz\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/setor.dz\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/setor.dz\/en\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":3,"href":"https:\/\/setor.dz\/en\/wp-json\/wp\/v2\/portfolio\/3243\/revisions"}],"predecessor-version":[{"id":3342,"href":"https:\/\/setor.dz\/en\/wp-json\/wp\/v2\/portfolio\/3243\/revisions\/3342"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/setor.dz\/en\/wp-json\/wp\/v2\/media\/2874"}],"wp:attachment":[{"href":"https:\/\/setor.dz\/en\/wp-json\/wp\/v2\/media?parent=3243"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/setor.dz\/en\/wp-json\/wp\/v2\/portfolio_category?post=3243"},{"taxonomy":"portfolio_tag","embeddable":true,"href":"https:\/\/setor.dz\/en\/wp-json\/wp\/v2\/portfolio_tag?post=3243"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}